Hi Mark,
another wish for the future from my side.
In order to track the gain correctly it would by nice, when i can specify the OOP Cost Value in two currencies.
1. Currency of the instrument (e.g. EUR for Euro)
2. Amount in the currency of the Portfolio (e.g. CHF or USD)
Sample
Tansfer in:
100 shares of Instrument A, OOP Cost Value in EUR 15000.--, OOP Cost Value in CHF 18732.--
Only with this information the calculation of the Gain/Loss is correct.
Thanks
Hansjörg Zimmermann